The Southline Phase 2 logoLink to Sacramento Regional Transit


Espanol button

ALIGNMENT/STATION LOCATION MAP

The map below illustrates the proposed alignment and station locations of the South Line Phase 2 Project as currently proposed.


station map



pdf iconDownload PDF

Station Designs

Station design presentations include site analyses, schematic site plans and shelter plans, and renderings.

Morrison Creek, Franklin, and Center Parkway Stations:
The design consultant, The HLA Group, has presented RT with three design concepts for each station. In order to enhance the urban design of the Cosumnes River Boulevard corridor and to improve construction efficiency, a single concept will be applied to all three of these stations. RT will select one concept after completing an internal review process. Based on feedback at the community meeting, there is not a clear community preference for any one concept.

Presentation (File size 2.5MB)

 

Cosumnes River College:
The Cosumnes River College (CRC) Station will be located on the CRC campus, just north of the east College Entrance off of Bruceville Road. The design consultant, MFDB Architects, prepared three design concepts. The South Line Phase 2 Project also includes a 5-story, 2,016-stall parking structure that is designed by International Parking Design and will be constructed by Otto Construction, under contract to the Los Rios Community College District (LRCCD). RT and LRCCD selected a station design alternative that includes shelters with relatively generous translucent roofs, and stairs and a ramp leading to a bridge over the college entrance road and connecting to the third floor of the parking structure.

Presentation (File size 9 MB)